PROJECTS

Guangzhou Chebei South Tunnel (Metal Side Cladding Panel)

Date
2022
Location
China
Product Used
Metal Side Cladding Panel
Share as

Chebei South Tunnel (Metal Side Cladding Panel) is a river crossing tunnel in Guangzhou, constructed in 2018 and opened to traffic on January 18, 2023, which is the second river crossing tunnel in Guangzhou connecting the north bank of Guangzhou through the Pearl River, starting from the north side of Xingang East Road in Haizhu District in the south, going down through the Pearl River, intersecting with Linjiang Avenue and Huacheng Avenue under construction in Tianhe District in the north, and terminating at the current intersection of Huangpu Avenue with a total length of about 2.07 kilometers, with a bi-directional 6 The total length is about 2.07 kilometers, two-way 6 lanes, design speed is 60 kilometers / hour. Is connected to the Tianhe District, Haizhu District, an important link in the transportation artery, after the completion of the Pazhou Bridge, Dongpu Bridge can effectively alleviate the traffic pressure across the river.

Start Your
Project Now!

Smart green space, building a better life.
NEWSLETTER

    CONTACT INFO